The Katuni wind farm is located in the Šestanovac municipality, near the town of Omiš, and was put into operation in 2017. It consists of 12 wind turbines manufactured by General Electric and has a total of 34.2, MW of installed wind power. Annually, the wind farm can produce about 90 GWh of electricity.
Number of installations: | 12 |
Type: | General Electric 2.85 |
Investment amount: | 40.000.000 € |
Rated power: | 34.20 MW |
Commissioning: | 2016 |
Annual production: | 90 GWh |
Corresponds to annual consumption: | more than 100,000.00 € |
Location: | Split-Dalmatia County |