The wind farm Ponikve is located on the Pelješac peninsula and it is the first wind farm developed in Dubrovnik-Neretva County. Construction of the plant began in 2011 and was put into operation in 2013. The total installed capacity of the project is 36.8 MW divided into 16 Enercon E-70 wind turbines with an individual rated power of 2.3 MW. The power plant annually produces about 65 GWh of clean electricity.
Number of installations: | 16 |
Type: | Enercon E-70 |
Investment amount: | 46.000.000 € |
Rated power: | 36.80 MW |
Commissioning: | 2012 |
Annual production: | 65 GWh |
Corresponds to annual consumption: | more than 70.000,00 € |
Location: | Dubrovnik-Neretva County |